How long will my extension Take to build

 
number-one-echo-wall-clock-posh-grey-936960.jpg
 
 

How long will my extension

Something we are asked frequently here at Inside Out is “How long will my extension take to build?” This one is much more difficult to answer than “How much will my extension cost?” but it is one that we do our best to provide an answer to. When building an extension, there are certain aspects of the build that take a specific amount of time and there are other aspects that are unknowns or factors that could takes days, weeks or months depending on the build.

Any time you plan a build project such as an extension, there are certain factors that play a role in the length of time it takes to complete the project. Let’s take a look at some of these factors and the average length of time it takes to complete each one:

Choosing a design team-1 month

When adding an extension to your home, you want to find the right design team that is experienced in creating the type or style of design that suits your needs. This could take up to a month or longer.

Project Design- 2 Months

Once you have chosen your design team, they will get to work creating a design that suits your home and your style. You will receive an initial proposal within a week or two and the entire design phase could take up to two months depending on your requirements.

Planning- 3 Months

  Depending on where your home is located, you will need to submit your plans to the local authority planning department for approval. This could take up to 8 weeks or longer depending on the complexity of the plan.

Building regulations-2 Months

Now that the plan is approved, more detailed plans need to be created following building regulations. Expect this to take an additional 2 months.

Choosing your builder-1 Month

It could take up to 1 month or longer to choose the right builder for your project. Then, that builder will need to look over the plans and create an estimate.

Construction-4 Months

The construction phase could take up to 4 months as it contains factors that could speed up or slow down progress. Larger extensions could take 6 months or longer.

Finishing and Trimwork-2 Months

 Although your extension may look move-in ready from the outside, there is still finish and trim work that must be completed for the project to be finalised. Depending on the size of the project and homeowner requirements, this could take 2 months or more.

If you have questions about an upcoming home extension project, contact Lewis Visuals today for a no-obligation consultation that could save you time and money on your next home extension project.

 

 
 
Blog Post AuthorJuly 10, 2018
Facebook0 Twitter Pinterest0 0 Likes
Previous

Improve DON’T Move

Blog Post AuthorJuly 10, 2018
 
Global 100 - 2020 award logo Inside Out Your Space.jpg
 
MASep20783 - Inside Out Your Space Winners Logo.png
Winner badge 4.png 1712BU11 - Genevieve Wells Winners Logo.jpg 2019-best-of-houzz-service-badge-1.jpg Best for Construction  Design 2015  Surrey UK (2).jpg download (1).png download.png L_SE_DOYA_Finalist .jpg SURREY 2015 logo-WINNER.jpg WICE Winner.jpg
Inside Out - Your Space
9 Old Church Lane,
Farnham, England, GU9 8HH,
United Kingdom
01252 902240 info@insideout-yourspace.co.uk
Hours
Mon 9am - 5pm
Tue 9am - 5pm
Wed 9am - 5pm
Thu 9am - 5pm
Fri 9am - 5pm
PrivacyTerms of ServiceTerms and Conditions
 

Powered by Squarespace